Project Overview
Client: Steel Factory
Location: Middle East
Year of Commissioning: 2017
Application: Treated water for steel production
Capacity: 6,000 m³/day
Project Background
The steel plant required a reliable source of treated water to support its production processes. The feed water was a combination of surface water and pretreated effluent, with seasonal fluctuations in quality and high levels of suspended solids.
Engineering Solution
The treatment system was designed to deliver 6,000 m³/day of high-quality water. The process train included:
Sand filtration
Activated carbon filtration
Cartridge filtration
Reverse osmosis (RO)

The system was pre-assembled and delivered in modular skids, enabling full installation within 20 days. Membranes were supplied by Filmtec.
Operational Results
The plant has consistently produced high-quality water for steel production, with minimal maintenance and high operator satisfaction.
Regional Impact
This project enabled water reuse and reduced freshwater dependency, contributing to sustainable industrial growth in the region.