Project Background

The steel plant required a reliable source of treated water to support its production processes. The feed water was a combination of surface water and pretreated effluent, with seasonal fluctuations in quality and high levels of suspended solids.


Engineering Solution

The treatment system was designed to deliver 6,000 m³/day of high-quality water. The process train included:

Sand filtration

Activated carbon filtration

Cartridge filtration

Reverse osmosis (RO)


The system was pre-assembled and delivered in modular skids, enabling full installation within 20 days. Membranes were supplied by Filmtec.


Operational Results

The plant has consistently produced high-quality water for steel production, with minimal maintenance and high operator satisfaction.


Regional Impact